• Conducting "Final Location Survey" (Approx 6.5 Km. length) along with preparation of L-Section, Yard Plans also "Design and drawings" of ROR, Major bridge, Minor bridges, RUBs and all relevant bridges for ROR in DOWN line to avoid surface crossing at Garhwa Road.
• Conducting "Final Location Survey", Design and drawings" and "Soil Exploration" along with preparation of L-Section & X-Section of Road & Railway line, Land Plans, Design and drawing of all Bridges & RE Wall also collecting all required input data for design near New Prop. ROB in lieu of LC No. 35/B/T (S&T No. 1 3/B/T) at Km.- 2 1 7I I 0-1 2 between Demu - Latehar Section and LC No. 39/Spl/T at Km. 1 20/3-4 PTRU Stn. Limit between Bhurkunda - Patratu in CIC Section of Dhanbad Division under Dy.CE/Con/BRKA of East Central Railway.
• Conducting "Final Location Survey", Design and drawings" and "Soil Exploration" along with preparation of L-Section & X-Section of Road & Railway line, Land Plans, Design and drawing of all Bridges & RE Wall also collecting all required input data for design near New Prop. ROB in lieu of LC No. 35/B/T (S&T No. 1 3/B/T) at Km.- 2 1 7I I 0-1 2 between Demu - Latehar Section and LC No. 39/Spl/T at Km. 1 20/3-4 PTRU Stn. Limit between Bhurkunda - Patratu in CIC Section of Dhanbad Division under Dy.CE/Con/BRKA of East Central Railway.